Water update, April 15

The well water start up has been plagued by freezing temps and leaks. The current status is: disinfectant has pumped through the water system up to each cottage. Now the system must set for 24 hrs. to allow the disinfectant to kill any bacteria that may have entered the system over the winter. Next the system must be flushed with fresh water from the well. After flushing, samples must be collected from each of the two wells.and analyzed at the Kirby Health Center. When we receive notification of no bacteria present, we can start the system
We expect water should be available beginning Friday April 22 I will send out another email on the 22nd with an updated status..

Advertisements
This entry was posted in Uncategorized. Bookmark the permalink.